The following message is from SSP Hopeton Nicholson:
The flat bridge is now passable and the roadway north of the Flat Bridge has is reduced to a single Lane due because the trailers are still occupying a section of the roadway. The entire roadway in the Bog Walk Gorge should be able to return to regular traffic in about twenty minutes.
Pleas share this blog with other motorists. Thanks.
Ok good to hear😀
ReplyDelete